Lintott Associates, Inc. Start-UP Service provides customers with Lintott
Associates, Inc./APC Authorized Personnel to ensure proper start-up of your UPS
or Power Array system. Lintott Associates, Inc. will energize and check
functionality of the system in all modes to ensure compliance with stated
technical specifications. In all cases, the system must be electrically
installed prior to the start-up. Lintott Associates, Inc./APC will guarantee
that the system is operating according to APC standards and ensure that the full
warranty will apply.
In the case of APC's single-phase UPS and Symmetra Power Array product lines,
Lintott Associates, Inc. service personnel will:
- Verify wiring is correct
- Conduct a visual inspection of both the unpacked frame and the
input/output hard wiring performed by the licensed electrician (if required)
- Load units with battery modules and power modules (if applicable)
- Start up of the unit and perform a comprehensive diagnostic and self test
- Train your support staff on the proper use of the unit
In the case of APC's Silcon 3-phase product line, Lintott Associates, Inc.
service personnel will:
- Verify wiring is correct, note any discrepancies
- Perform visual inspection of UPS equipment to ensure that all connections
are properly fixed and tight
- Verify that all power wires are terminated in correct location, using ohm
meter and physical inspection
- Verify proper operation of all internal functions
- Verify that all electrical wiring complies with all local/national
electrical codes and regulations
- Verify bypass operational, static and manual
- Verify proper internal battery string voltages
- Verify proper regulation of output waveform, and integrity of all phases
- Record all front panel reading and parameter stacks
- Clean system
- Start up of the unit and perform a comprehensive diagnostic and self test
- Train your support staff on proper use of the unit
Benefits to Customer:
- Assurance of proper installation
- The UPS system will be performing to specifications by the end of the
service
- Assurance that full warranty will apply
- Training of support staff on proper use
Important Points:
- For 3-phase environments, separate contracts must be purchased for
external batteries
- For Single-phase or Power Array environments, separate contracts must be
purchased for extended run batteries (XL, XR)
- APC Authorized Personnel will accomplish the Start-UP Service
- For 3-phase UPS systems, this service must be purchased or factory
warranty becomes parts-only
- UPS or Power Array systems must be already electrically installed and
wired prior to Start-UP Service
- Customer must purchase one contract per UPS
- Allow for a two week lead time in service scheduling
- Part Number: WISTL-T
Discounts:
- Customers who purchase this service for multiple units (or units with
XL/XR frames) housed in the same location and can be serviced on the same
day, can qualify for a discount.